Khargone is a key industrial and agro-processing hub in the Nimar belt. R-Solar has a local team based in Khargone and has already commissioned solar installations in the district. We now bring the same OPEX model to your factory — you pay per unit, we own everything else.
Who We Serve in Khargone
High-load seasonal operations benefit from solar to reduce peak-hour grid dependence.
Oil mills, dal mills, and food processors with strong daytime loads and rising tariff exposure.
Energy-intensive processing facilities — ideal for 500kW+ OPEX plants near the processing units.
Warehousing and cold storage operations in the Nimar agricultural corridor.
How It Works
Zero capex for your factory. R-Solar retains full asset ownership and handles all compliance, metering, and MPERC reporting.
| Parameter | Your Current Cost | With R-Solar PPA |
|---|---|---|
| Energy tariff | ~₹7.50/kWh (grid) | ₹4.50/kWh (fixed) |
| Open Access surcharge | N/A | ₹1.24/kWh (wheeling + T) |
| Total landed cost | ₹7.50/kWh | ~₹5.74/kWh |
| Saving per unit | ~₹1.76/kWh (~24%) | |
| Monthly generation (per MW) | ~13,200 units | |
| Annual saving per MW | ~₹95 Lakh | |
| Your capex | ₹4–6 Cr (own plant) | ₹0 |
| RPO compliance | REC purchase cost | Automatic, no cost |
Based on 5.5–5.8 kWh/m²/day solar irradiation in Khargone. Green Zone CSS waiver available — further reduces landed cost.
Local Presence
Khargone district is in MP's prime solar belt — average irradiation of 5.5–5.8 kWh/m²/day. R-Solar's existing installations here validate the OPEX model at district scale.
Our nearest office: Jyoti Nagar, Khargone — local team. Site assessment, financial modelling, and PPA structuring are done at no cost.
Send us your electricity bill and we will model the savings, PPA structure, and timeline — at no cost and no obligation.