Khargone is a key industrial and agro-processing hub in the Nimar belt. r-solar has a local team based in Khargone and has already commissioned solar installations in the district. We now bring the same OPEX model to your factory: you pay per unit, we own everything else.
Who We Serve in Khargone
High-load seasonal operations benefit from solar to reduce peak-hour grid dependence.
Oil mills, dal mills, and food processors with strong daytime loads and rising tariff exposure.
Energy-intensive processing facilities, ideal for 500kW+ OPEX plants near the processing units.
Warehousing and cold storage operations in the Nimar agricultural corridor.
How It Works
check_circle Zero capex for your factory. r-solar retains full asset ownership and handles all compliance, metering, and MPERC reporting.
| Parameter | Your Current Cost | With r-solar PPA |
|---|---|---|
| Energy tariff | ~₹7.50/kWh (grid) | ₹4.50/kWh (fixed) |
| Open Access surcharge | N/A | ₹1.24/kWh (wheeling + T) |
| Total landed cost | ₹7.50/kWh | ~₹5.74/kWh |
| Saving per unit | ~₹1.76/kWh (~24%) | |
| Monthly generation (per MW) | ~13,200 units | |
| Annual saving per MW | ~₹95 Lakh | |
| Your capex | ₹4–6 Cr (own plant) | ₹0 |
| RPO compliance | REC purchase cost | Automatic, no cost |
infoBased on 5.5–5.8 kWh/m²/day solar irradiation in Khargone. Green Zone CSS waiver available, further reduces landed cost.
Local Presence
Khargone district is in MP's prime solar belt, with average irradiation of 5.5–5.8 kWh/m²/day. r-solar's existing installations here validate the OPEX model at district scale.
Our nearest office: Jyoti Nagar, Khargone (local team). Site assessment, financial modelling, and PPA structuring are done at no cost.
Send us your electricity bill and we will model the savings, PPA structure, and timeline, at no cost and no obligation.