Industrial Solar Calculator · Madhya Pradesh
How much can your factory save
with solar PPA?
Enter your monthly bill and consumption. Results update instantly. No sign-up required.
Your facility details
₹
Lakh/month
Enter the total amount on your DISCOM monthly electricity bill
kWh/month
Total units (kWh) from your electricity bill. Check the "Energy Charges" section.
19%
MP annual solar CUF typically ranges 17–22% for ground-mount. 19% is a conservative baseline.
Your savings estimate
₹--
Estimated annual saving
Current annual bill
₹--
Annual PPA cost (indicative ₹4.50/kWh)
₹--
Annual saving (Year 1)
₹--
Saving as % of current bill
--
Indicative system size
--
Annual generation
--
25-yr cumulative saving
₹--
CO₂ avoided (annual)
--
Annual energy cost: Grid (red) vs PPA (green)
Year 1
Year 25
These are indicative estimates. Actual savings depend on your exact consumption profile, grid connection, and OA charge structure. Get a detailed model:
Get a detailed PPA proposalCalculator assumptions
- PPA base tariff: ₹4.50/kWh (indicative, subject to site survey) for Open Access ground-mount at 10 MW scale. Rooftop behind-the-meter may differ.
- Open Access landed cost (wheeling + transmission + CSS) of ~₹1.24/kWh already factored into the ₹4.50/kWh PPA offer (indicative, subject to site survey).
- System sizing uses a capacity factor (CUF) of 19% at 365 days × 24 hrs = 8,760 hrs/yr.
- CO₂ calculation uses India's CEA grid emission factor of 0.713 tCO₂/MWh (FY 2023).
- 25-year projections are illustrative. Actual returns subject to OA regulatory changes, site conditions, and financing terms.
Next Step
Like what you see? Get the real numbers.
Our team will build a full financial model from your actual electricity bills and tell you exactly what an r-solar PPA would deliver for your facility.