Indore, Madhya Pradesh

Industrial Solar for Indore Factories
OPEX Model. Zero Capex. r-solar Office in Indore.

Indore is MP's industrial capital, home to Pithampur's auto cluster, pharma hubs, and FMCG majors. r-solar has an office in Indore (Rau) and is actively developing OPEX solar projects for large consumers across the Indore–Pithampur corridor.

Zero Capex
₹4.50/kWh Fixed
25-Year PPA
RPO Compliant

Industries We Work With in Malwa Plateau

Auto Components

Pithampur's auto cluster runs energy-intensive manufacturing, ideal for 500kW+ OPEX plants with Open Access.

Pharma & Chemicals

Round-the-clock facilities with predictable loads qualify directly for Open Access and RPO compliance.

Textiles & Apparel

High daytime electricity consumption aligned with solar generation profiles.

FMCG & Packaging

Large distribution and manufacturing units with 33kV+ contracted demand.

The r-solar OPEX Model for Indore Factories

r-solar Finances
100% project cost
r-solar Builds
Plant on your site
r-solar Owns
Asset on our books
r-solar O&M
All maintenance
You Pay Per Unit
₹4.50/kWh fixed

Zero capex for your factory. r-solar retains full asset ownership and handles all compliance, metering, and MPERC reporting.

Solar Savings Estimate for Indore

ParameterYour Current CostWith r-solar PPA
Energy tariff~₹7.50/kWh (grid)₹4.50/kWh (fixed)
Open Access surchargeN/A₹1.24/kWh (wheeling + T)
Total landed cost₹7.50/kWh~₹5.74/kWh
Saving per unit~₹1.76/kWh (~24%)
Monthly generation (per MW)~12,500 units
Annual saving per MW~₹90 Lakh
Your capex₹4–6 Cr (own plant)₹0
RPO complianceREC purchase costAutomatic, no cost

Based on 5.2–5.5 kWh/m²/day solar irradiation in Indore. Green Zone CSS waiver available, further reduces landed cost.

r-solar in Indore and Malwa Plateau

Indore is MP's largest industrial hub, with Pithampur SEZ hosting 700+ manufacturing units, the state's highest density of Open Access-eligible consumers.

Our nearest office: Rau, Indore (local team). Site assessment, financial modelling, and PPA structuring are done at no cost.

Eligibility Checklist
  • Contracted demand of 100kW or above
  • Monthly electricity bill of ₹3 Lakh or above
  • Available rooftop or ground space (or nearby land)
  • Operations planned for 10+ years (PPA alignment)
  • HT/LT industrial tariff connection (MPEB/MPEZ)

Is Your Indore Factory Eligible?

Send us your electricity bill and we will model the savings, PPA structure, and timeline, at no cost and no obligation.

  • Free site assessment & financial model
  • Custom PPA rate proposal
  • No capex, no obligation
Get a Free PPA Proposal

Or calculate savings first

Chat with us
Call Now WhatsApp Get Quote