Industrial Solar for Indore Factories
OPEX Model. Zero Capex. r-solar Office in Indore.
Indore is MP's industrial capital, home to Pithampur's auto cluster, pharma hubs, and FMCG majors. r-solar has an office in Indore (Rau) and is actively developing OPEX solar projects for large consumers across the Indore–Pithampur corridor.
Who We Serve in Indore
Industries We Work With in Malwa Plateau
Auto Components
Pithampur's auto cluster runs energy-intensive manufacturing, ideal for 500kW+ OPEX plants with Open Access.
Pharma & Chemicals
Round-the-clock facilities with predictable loads qualify directly for Open Access and RPO compliance.
Textiles & Apparel
High daytime electricity consumption aligned with solar generation profiles.
FMCG & Packaging
Large distribution and manufacturing units with 33kV+ contracted demand.
How It Works
The r-solar OPEX Model for Indore Factories
check_circle Zero capex for your factory. r-solar retains full asset ownership and handles all compliance, metering, and MPERC reporting.
Solar Savings Estimate for Indore
| Parameter | Your Current Cost | With r-solar PPA |
|---|---|---|
| Energy tariff | ~₹7.50/kWh (grid) | ₹4.50/kWh (fixed) |
| Open Access surcharge | N/A | ₹1.24/kWh (wheeling + T) |
| Total landed cost | ₹7.50/kWh | ~₹5.74/kWh |
| Saving per unit | ~₹1.76/kWh (~24%) | |
| Monthly generation (per MW) | ~12,500 units | |
| Annual saving per MW | ~₹90 Lakh | |
| Your capex | ₹4–6 Cr (own plant) | ₹0 |
| RPO compliance | REC purchase cost | Automatic, no cost |
infoBased on 5.2–5.5 kWh/m²/day solar irradiation in Indore. Green Zone CSS waiver available, further reduces landed cost.
Local Presence
r-solar in Indore and Malwa Plateau
Indore is MP's largest industrial hub, with Pithampur SEZ hosting 700+ manufacturing units, the state's highest density of Open Access-eligible consumers.
Our nearest office: Rau, Indore (local team). Site assessment, financial modelling, and PPA structuring are done at no cost.
Eligibility Checklist
- check_circleContracted demand of 100kW or above
- check_circleMonthly electricity bill of ₹3 Lakh or above
- check_circleAvailable rooftop or ground space (or nearby land)
- check_circleOperations planned for 10+ years (PPA alignment)
- check_circleHT/LT industrial tariff connection (MPEB/MPEZ)
Is Your Indore Factory Eligible?
Send us your electricity bill and we will model the savings, PPA structure, and timeline, at no cost and no obligation.
- check_circleFree site assessment & financial model
- check_circleCustom PPA rate proposal
- check_circleNo capex, no obligation