Skip to main content
Indore, Madhya Pradesh

Industrial solar for Indore factories
OPEX model. Zero capex. r-solar office in Indore.

Indore is MP's industrial capital, home to Pithampur's auto cluster, pharma hubs, and FMCG majors. r-solar has an office in Indore (Rau) and is actively developing OPEX solar projects for large consumers across the Indore–Pithampur corridor.

Zero capex
Indicative ₹4.50/kWh
25-year PPA
RPO compliant

Industries we work with in Malwa Plateau

directions_car

Auto components

Pithampur's auto cluster runs energy-intensive manufacturing, ideal for 500kW+ OPEX plants with Open Access.

medication

Pharma and chemicals

Round-the-clock facilities with predictable loads qualify directly for Open Access and RPO compliance.

apparel

Textiles and apparel

High daytime electricity consumption aligned with solar generation profiles.

move_to_inbox

FMCG and Packaging

Large distribution and manufacturing units with 33kV+ contracted demand.

The r-solar OPEX model for Indore factories

payments
r-solar finances
100% project cost
solar_power
r-solar builds
Plant on your site
apartment
r-solar owns
Asset on our books
handyman
r-solar O&M
All maintenance
You pay per unit
₹4.50/kWh (indicative, subject to site survey)

Zero capex for your factory. r-solar retains full asset ownership and handles all compliance, metering, and MPERC reporting.

Solar savings estimate for Indore

ParameterYour Current CostWith r-solar PPA
Energy tariff~₹7.50/kWh (grid)₹4.50/kWh (indicative, subject to site survey)
Open Access surchargeN/A₹1.24/kWh (wheeling + T)
Total landed cost₹7.50/kWh~₹5.74/kWh
Saving per unit~₹1.76/kWh (~24%)
Monthly generation (per MW)~12,500 units
Annual saving per MW~₹90 Lakh
Your capex₹4–6 Cr (own plant)₹0
RPO complianceREC purchase costAutomatic, no cost

Based on 5.2–5.5 kWh/m²/day solar irradiation in Indore. Green Zone CSS waiver available, further reduces landed cost.

r-solar in Indore and Malwa Plateau

Indore is MP's largest industrial hub, with Pithampur SEZ hosting 700+ manufacturing units, the state's highest density of Open Access-eligible consumers.

Our nearest office: Rau, Indore (local team). Site assessment, financial modelling, and PPA structuring are done at no cost.

Eligibility checklist

  • Contracted demand of 100kW or above
  • Monthly electricity bill of ₹3 Lakh or above
  • Available rooftop or ground space (or nearby land)
  • Operations planned for 10+ years (PPA alignment)
  • HT/LT industrial tariff connection (MPEB/MPEZ)

Is your Indore factory eligible?

Send us your electricity bill and we will model the savings, PPA structure, and timeline, at no cost and no obligation.

  • Free site assessment and financial model
  • Custom PPA rate proposal
  • No capex, no obligation
Download commercial solar booklet

Get a free PPA proposal

Or calculate savings first

Zero upfront cost

Prefer not to spend capital on solar?

Under our RESCO model, r-solar finances, builds, owns and maintains the plant on your roof. You simply buy the power it generates, cheaper than the grid, with nothing upfront.

Chat with us
Call Now WhatsApp Get Quote