Pithampur is one of India's fastest-growing industrial estates — 700+ units, including Tier-1 auto suppliers, pharma manufacturers, and engineering firms. R-Solar develops OPEX solar plants for Pithampur factories so they save 40% on electricity without touching capital.
Who We Serve in Pithampur
Tier-1 and Tier-2 suppliers with large contracted demand and mandated RPO compliance from FY25-26.
Press shops, foundries, and machining units with high daytime loads — classic OPEX candidates.
Regulated facilities with continuous operations and ESG reporting requirements.
Large rooftop areas and steady baseload — well-suited for behind-the-meter or Open Access solar.
How It Works
Zero capex for your factory. R-Solar retains full asset ownership and handles all compliance, metering, and MPERC reporting.
| Parameter | Your Current Cost | With R-Solar PPA |
|---|---|---|
| Energy tariff | ~₹7.50/kWh (grid) | ₹4.50/kWh (fixed) |
| Open Access surcharge | N/A | ₹1.24/kWh (wheeling + T) |
| Total landed cost | ₹7.50/kWh | ~₹5.74/kWh |
| Saving per unit | ~₹1.76/kWh (~24%) | |
| Monthly generation (per MW) | ~12,500 units | |
| Annual saving per MW | ~₹90 Lakh | |
| Your capex | ₹4–6 Cr (own plant) | ₹0 |
| RPO compliance | REC purchase cost | Automatic, no cost |
Based on 5.2–5.5 kWh/m²/day solar irradiation in Pithampur. Green Zone CSS waiver available — further reduces landed cost.
Local Presence
Pithampur SEZ hosts some of India's largest automotive manufacturers — and faces some of the highest industrial electricity tariffs in MP. A PPA is the fastest path to 30% RPO compliance.
Our nearest office: Rau, Indore — 18 km away. Site assessment, financial modelling, and PPA structuring are done at no cost.
Send us your electricity bill and we will model the savings, PPA structure, and timeline — at no cost and no obligation.