Pithampur is one of India's fastest-growing industrial estates, with 700+ units including Tier-1 auto suppliers, pharma manufacturers, and engineering firms. r-solar develops OPEX solar plants for Pithampur factories so they save 40% on electricity without touching capital.
Who We Serve in Pithampur
Tier-1 and Tier-2 suppliers with large contracted demand and mandated RPO compliance from FY25-26.
Press shops, foundries, and machining units with high daytime loads. Classic OPEX candidates.
Regulated facilities with continuous operations and ESG reporting requirements.
Large rooftop areas and steady baseload, well-suited for behind-the-meter or Open Access solar.
How It Works
check_circle Zero capex for your factory. r-solar retains full asset ownership and handles all compliance, metering, and MPERC reporting.
| Parameter | Your Current Cost | With r-solar PPA |
|---|---|---|
| Energy tariff | ~₹7.50/kWh (grid) | ₹4.50/kWh (fixed) |
| Open Access surcharge | N/A | ₹1.24/kWh (wheeling + T) |
| Total landed cost | ₹7.50/kWh | ~₹5.74/kWh |
| Saving per unit | ~₹1.76/kWh (~24%) | |
| Monthly generation (per MW) | ~12,500 units | |
| Annual saving per MW | ~₹90 Lakh | |
| Your capex | ₹4–6 Cr (own plant) | ₹0 |
| RPO compliance | REC purchase cost | Automatic, no cost |
infoBased on 5.2–5.5 kWh/m²/day solar irradiation in Pithampur. Green Zone CSS waiver available, further reduces landed cost.
Local Presence
Pithampur SEZ hosts some of India's largest automotive manufacturers and faces some of the highest industrial electricity tariffs in MP. A PPA is the fastest path to 30% RPO compliance.
Our nearest office: Rau, Indore (18 km away). Site assessment, financial modelling, and PPA structuring are done at no cost.
Send us your electricity bill and we will model the savings, PPA structure, and timeline, at no cost and no obligation.