Mandideep industrial estate — MP's second largest industrial cluster after Pithampur — is home to major pharma, chemical, and engineering manufacturers. R-Solar is developing OPEX solar for Mandideep factories under 25-year PPAs, with all project cost and O&M handled entirely by us.
Who We Serve in Mandideep
Mandideep hosts some of India's leading pharma manufacturers with continuous high-load operations and ESG mandates.
Energy-intensive chemical processing units with 33kV connections and strong RPO compliance needs.
Machine shops, foundries, and assembly plants with daytime-heavy electricity demand.
Large consumer goods manufacturers near the state capital with strong ESG reporting requirements.
How It Works
Zero capex for your factory. R-Solar retains full asset ownership and handles all compliance, metering, and MPERC reporting.
| Parameter | Your Current Cost | With R-Solar PPA |
|---|---|---|
| Energy tariff | ~₹7.50/kWh (grid) | ₹4.50/kWh (fixed) |
| Open Access surcharge | N/A | ₹1.24/kWh (wheeling + T) |
| Total landed cost | ₹7.50/kWh | ~₹5.74/kWh |
| Saving per unit | ~₹1.76/kWh (~24%) | |
| Monthly generation (per MW) | ~12,000 units | |
| Annual saving per MW | ~₹86 Lakh | |
| Your capex | ₹4–6 Cr (own plant) | ₹0 |
| RPO compliance | REC purchase cost | Automatic, no cost |
Based on 5.0–5.3 kWh/m²/day solar irradiation in Mandideep. Green Zone CSS waiver available — further reduces landed cost.
Local Presence
Mandideep is one of MP's fastest-growing industrial estates, with 1,000+ registered units and strong demand for RPO-compliant renewable energy solutions.
Our nearest office: Indore office — 90 km; Barwani HQ — 150 km. Site assessment, financial modelling, and PPA structuring are done at no cost.
Send us your electricity bill and we will model the savings, PPA structure, and timeline — at no cost and no obligation.